lundi 26 avril 2010

Week 27 [12/04 to 18/04]

Work Of The Week

This was the last development week. After the 18th no more code will be modified, and all non-solved bugs will be added to the bug.txt file given with the software. Few are already in. and it is hoped that few will be.

Total worked: 14 hours.

Last release and bugs correction


Several small bugs were corrected during that week. One in the selection code (the last vertex was always added during sweep selection). The update selection when running the subdivision algorithm was also taking time, but was not really solved. The subdivision won't be applicable to a selection.

The trouble functionalities found so far but not corrected are removed from the release (like the command line options that causes trouble if Qt takes too much time to load).

Generating working binaries for windows and linux took time, as verification was needed that everything was as perfect as possible.
Time worked:
7 h

Report

Of course some efforts were put into the report too, that is growing bigger and bigger. Time worked:
7 h

Gantt State

Behold the final Gantt diagram

Gantt State to be added


Next Week prevision

Next week is the last week before submission. The presentation will be setted up, and the report will be finished.