Work Of The Week 
The main work area of the week was the requirements. As the researches goes to a point that a focus was needed to be efficient, I stop the process without taking a look furthermore in the algorithms details.
Total worked: 7 hours.
Research | |
Reading about one of the algorithms used in Denoising 3D Models with Attributes using Soft Thresholding. Taking some notes to understand how that works, but need to work more on it. | Time worked: 1 h |
Reading and searching about OBJ file format. Found one good definition of it. | Time worked: 1 h |
Requirements | |
Work on the functional requirements and the creation of the Detailed Requirement document. Using the lecture provided by Derek Shirreffs for the Project Management in a Computing Environment module. | Time worked: 2 h |
Project plan creation according to the functional requirements and correction of them after the meeting with Eyad Elyan. The result was the current Gantt diagram. | Time worked: 2 h |
Design: Interface drawing | |
Some first drawing of a possible interface for the software. Simple window looks and some options thinking. | Time worked: 1 h |
Gantt State
The Gantt diagram is now "finished" for it first state. It will certainly need some adaptation in the future, but the current state will be referred as the Initial Project Plan.
Edit note: edition of the image after finding that a part wasn't completely drawn.
Information And References
Detailed links that are presents in the above text:
The publication of Michaël Roy, Sebti Foufou, and Frédéric Truchetet: Denoising 3D Models with Attributes using Soft Thresholding
A definition of the OBJ format: obj_format.txt
Next Week prevision
This week is the last one before the submission of the Detailed Project Requirements. Therefore most of the work will be to finish this document and correct it with Eyad in order to have a strong and clear definition of the project goals. As the project plan is finished, the next work could also include the beginning of the design part in the Gantt diagram.
- finish the Detailed Requirement document
- begin the design part